 • Hollywood Apartment Building - Front facade replacement and improvements
     1670-1672 West Hollywood Avenue, Chicago, Illinois
• The building is an existing, 4-unit, 2-story plus basement, vintage (1923) apartment building.
• Project included complete removal and replacement of the existing face brick and limestone
   with new, matching the original building layout and castled style. The exterior wall
   construction is multi-wythe brick masonry.
• Removal and replacement of all steel lintels (beams and angles located at the top of window
   and door openings) with new.
• New metal clad wood double-hung windows with true divided lites at the upper sashes
   matching the original 1923 building window style.
• Remove existing concrete entry steps and stoop.
• New concrete entry steps and stoop including a new concrete foundation system. New
   concrete entry walk.
• New brick and limestone faced masonry landscape walls, piers and limestone planters/urns
   with associated new concrete footings and foundations.
Projects - Residential - Apartment Buildings
Click photo to see enlarged photo gallery.

After Construction

After Construction

After Construction

After Construction

After Construction

After Construction

After Construction

After Construction

After Construction

After Construction

Before Construction

During Construction

During Construction

During Construction

During Construction

During Construction

During Construction

During Construction

During Construction

During Construction

During Construction

Exterior - Front

Exterior - Front

Exterior - Side / Gangway

Basement Floor Plans

Basement Details

Basement Foundation & Framing Plans

Structural Details

Basement Plumbing Plan

Electrical Service Riser Diagram

Construction

Construction

Construction

Construction

Construction

Construction

Construction

Construction

Construction

Construction

Exterior

Exterior

Exterior

Site Plan - Existing / Demolition / New Construction

First Floor Plan - Existing
Basement Floor Plan - Existing / Demolition

Enlarged Floor Plan - Demolition

Enlarged Floor Plan - New Construction

Basement Floor Plan - New Construction

Basement Floor Plan - Mechanical

Basement Floor Plan - Electrical

Third Floor Plan - Existing
Second Floor Plan - Existing
 • Farwell Apartment Building - Interior remodel/alteration
     2147 West Farwell Avenue, Garden level apartment, Chicago, Illinois
 • Hollywood Apartment Building - New addition, exterior steel stairs and decks
     1670-1672 West Hollywood Avenue, Chicago, Illinois
• Partial gut rehab and extensive interior remodel/alterations to the garden level of existing
   4-story plus garden level, vintage (1913), 10,653 square foot, apartment building.
• Convert existing 4-unit building to 3-unit building.
• Combine existing studio apartment and 1-bedroom apartment into new 2-bedroom,
   2-bathroom apartment.
• New kitchen, bathroom and in-unit laundry.
• New natural gas fired forced air heating and air conditioning system at garden level apartment.
• New 600 amp electrical service with new electrical panels at garden, first and second floor
   apartments. New electrical wiring and devices at garden apartment.
 • Irving/Pulaski Apartment Building - West facade replacement
     3946-3965 West Irving Park Road, Chicago, Illinois
• The building is an existing 3-story plus basement vintage (1921) 29,140 square foot building
   with 41 apartments located on the second and third floors and 8 commercial spaces located
   on the first floor.
• Complete removal and replacement of the existing face brick and limestone with new face
   brick, re-installed limestone and new limestone. The exterior wall construction is multi-wythe
   brick masonry.
• Removal and replacement of approximately 75% of the steel lintels (beams and angles
   located at the top of window and door openings) with new.
• New 3-story plus basement addition (672 square foot) to the back of the existing 4-unit,
   2-story plus basement, vintage (1923), 7,548 square foot, apartment building. Total square
   footage is 8,220, including new addition.
• The new addition square footage is the maximum allowed (grandfathered) by the Chicago
   Zoning Ordinance.
• The first floor of the addition includes a new family room, open to the existing kitchen and
   a new private unenclosed porch for the first floor west apartment.
• The second and third floors of the addition provide duplex (2-story) living space for the
   second floor west apartment. The second floor of the addition includes a new family room
   open to the existing kitchen and new interior spiral stair to third floor. The third floor of the
   addition includes a new sitting room with rooftop access for a future private rooftop deck.
• New 2-1/2 story exterior steel stair, located at the back of the building, which provides rooftop
   access and apartment egress.
• New steel framed decks for the first floor east and second floor east apartments. Each deck
   has exterior access doors from both the kitchen and dining room.
• Refer to reroofing projects for existing building reroofing, structural improvements and brick
   parapet wall replacement.
• New electrical panels and 600 amp electrical service.
 • Hood Apartment Building - Interior remodel/alteration, new windows
     1217 West Hood Avenue, Chicago, Illinois
• Partial gut rehab and extensive interior remodel/alterations to existing 3-story plus
   basement, vintage (1913), 6,143 square foot, apartment building.
• Convert 7-unit building to 4-unit building consisting of one, 2-bedroom, 2-bathroom unit
   and three, 3-bedroom, 2-bathroom units.
• New kitchens, bathrooms and in-unit laundry for each unit.
• New windows.
• New natural gas fired fireplaces.
• New water service and plumbing system.
• New natural gas fired forced air heating and air conditioning systems.
• New electrical panels, wiring and devices including new 600 amp electrical service.
 • Elmdale Apartment Building - Interior remodel/alteration
     1325 West Elmdale Avenue, Chicago, Illinois 
• Partial gut rehab and extensive interior remodel/alterations to existing 3-unit, 2-story plus
   basement, vintage (1913), 5,163 square foot, apartment building.
• Convert three, 2-bedroom, 1-bathroom apartments to one, 2-bedroom, 2-bathroom
   unit and two (2), 3-bedroom, 2-bathroom units.
• New kitchens, bathrooms and in-unit laundry for each unit.
• New natural gas fired fireplaces.
• New steel beams, steel columns and concrete floor at basement.
• New water service and plumbing system.
• New natural gas fired forced air heating and air conditioning systems.
• New electrical panels, wiring and devices including new 400 amp electrical service.
 • Cambridge Apartment Building -  Interior remodel/alteration
     2323-25 North Cambridge Avenue, Chicago, Illinois
• Partial gut rehab and extensive interior remodel/alterations to existing 4-unit, 3-bedroom,
   1-bathroom, 2-story plus partial unfinished utility basement, vintage (1911), 4,962 square
   foot, apartment building.
• New kitchens and bathrooms.
• New water service and plumbing system.
• New natural gas fired forced air heating and air conditioning systems.
• New electrical panels, wiring and devices including new 400 amp electrical service.
 • Olive Apartment Building - Interior and exterior alteration
     1461 West Olive Avenue, Chicago, Illinois
• Extensive basement alterations in existing 3-unit, 3-story plus basement, vintage (1913),
   6,196 square foot apartment building.
• Site improvements including new concrete sidewalks.
• Tuckpointing and waterproofing existing stone foundation.
• New drain tile (perforated subsoil drains) located at exterior of building foundation footings
   and associated sump pump system.
• Lower basement floor elevation 1'-2”.
• New concrete basement floor.
• New steel beams and steel columns at basement.
• Remove and replace basement located bathroom.
• Design for future duplex of the first floor apartment with/into basement.
• New natural gas fired forced air heating and air conditioning system.
• New plumbing system at basement.
• New 400 amp electrical service with new electrical panels, new wiring and devices at
   basement.
Projects

• Banking

• Restaurants

• Mercantile, Business & Retail

• Office & Health Facilities

• Religious

• Residential
        • Condominium Remodel
        • Apartment Buildings
        • Single Family

• Reroofing

• Zoning & Public Way

• Construction Loan Oversight
   Services
        • Condominiums
        • Hotels
        • Commercial & Industrial
        • Miscellaneous

• Property Condition Assessment

• Owner Representation Services